Standard installation covers installation of your waEV-charge EV charger on a brick or plaster wall, a maximum run of 10m of cable from the wall-mounted position to your consumer unit (fuse box), with no civil or remedial electrical work required.
Please ensure your charging schedule is active, your tariff settings are correct and your vehicle does not have conflicting charging timers enabled.
Standard installation covers installation of your waEV-charge EV charger on a brick or plaster wall, a maximum run of 10m of cable from the wall-mounted position to your consumer unit (fuse box), with no civil or remedial electrical work required.
Yes. The integrated vehicle compatibility list is actively being expanded to support additional vehicle manufacturers.
If the integration disconnects for any reason, such as the vehicle manufacturer service going offline, the charger will default to charging at the maximum rate during the configured off-peak charging period, provided the vehicle is plugged in.
During setup, you can configure an Auto Schedule by selecting your required battery percentage and desired ready-by time.